11Apr/12Off
Wave Project Under Construction
Sub Title: First grid-connected generation in Maine
Bill Opalka [1]
The first grid-connected tidal wave energy project in Maine is under construction and should be generating kilowatts by mid-summer.
To read the entire article go to: http://www.renewablesbiz.com/article/12/04/wave-project-under-construction&utm_medium=eNL&utm_campaign=RB_DAILY2&utm_term=Original-Member
Share This Post