The Terra News
11Apr/12Off

Wave Project Under Construction

Sub Title:  First grid-connected generation in Maine

Bill Opalka [1]

13448408-600x800.jpg [2]

The first grid-connected tidal wave energy project in Maine is under construction and should be generating kilowatts by mid-summer.

To read the entire article go to: http://www.renewablesbiz.com/article/12/04/wave-project-under-construction&utm_medium=eNL&utm_campaign=RB_DAILY2&utm_term=Original-Member

Share This Post
Comments (0) Trackbacks (0)

Sorry, the comment form is closed at this time.

No trackbacks yet.